Production

Process

01. Conditioning imports
img
Management item
- Report of raw materials, subsidiary materials
- Self component-analysis
- Visual inspection of raw materials and subsidiary materials
02. Dissolution
img
Related equipment
- Electric induction furnace (1500kw / 2ton)
Management item
- Charging weight, dissolution temperature
03. Electric induction furnace
img
Related equipment
- Spectrometer (Df-200)
Management item
- Molten Metal chemical analysis
04. Casting handling
img
Related equipment
- Processing line
Management item
- Mix rate, Mixer time, Casting temperature
05. Casting test
img
Related equipment
- Casting-moisture-measuring-instrument (MF-50)
- Filling-testing-machine
- Compression-strength-testing-machine (TCRK-200)
Management item
- Moisture, Filling, Compression-strength
- External exam twice a week
06. Molding
img
Related equipment
- Automatic moulding machine (AR8590)
Management item
- Mold breakage, Mold breakage or not, Mold hardness, Squeeze pressure, Jolt time
07. Tapping
img
Related equipment
- Electric induction furnace (1500kw / 2Ton)
- Electric induction furnace (1500kw / 2Ton)
Management item
- Outing amount, Tapping temperature
08. Injection
img
Related equipment
- Injection Raddle
- Immersed thermometer(0-1700℃)
Management item
- Injection time, Injection temperature, Injection weight, Stream inoculation
09. Biopsy / Component analysis
img
Related equipment
- Spectrometer(DF-200)
- A metallographic microscope(GX41)
Management item
- Chemical composition after inoculation
- Black Research tempered glass
10. Form removal and Talsa
img
Related equipment
- Shot facilities (Three types)
Management item
- Shot time, Current value, Shot product visual examination
11. Lapping
img
Related equipment
- A high-frequency generator
- Bench grinder
Management item
- Over grainding, Riser part Burr miss-match
12. Exterior subsequent inspection
img
Related equipment
- Industrial endoscope
Management item
- Product subsequent inspection, Testing of product inner crack and casting
13. Coating
img
Related equipment
- Trolley Coating Mechanical System
Management item
- Combination percentage, Painting concentration, Drying-time, Complete-product check-with naked-eyes
14. Complete product test
img
Related equipment
- A metallographic microscope (GX41), Brinell hardness
- Multi-use material tester (kk-30)
Management item
- Tensile Strength, Yield Strength, Elongation Percentage, Graphite Spheroidizing Ratio, Matrix Structure
15. Packing and shipment
img
Related equipment
- Standard pallet for each company
Management item
- Delivery label
- Product amount